Solar System Installation Services
We provide solar installation services for:
Residential Homes & Villas
From 1kW to 20kW systems, perfect for houses, apartments, and farmhouses.Commercial Buildings & Offices
Save big on energy costs with scalable solar systems designed for shops, plazas, and corporate offices.Industrial Plants & Warehouses
High-capacity systems with net metering and energy monitoring for manufacturing and logistics facilities.Agricultural & Rural Areas
Solar tube wells, irrigation systems, and off-grid setups for farms and remote villages.Institutions – Schools, Colleges, Hospitals
Stable power for critical facilities with backup and hybrid options.
1. Site Inspection & Feasibility Survey
We assess your property, sunlight exposure, and load requirements to design the most efficient solution.
2. System Design & Quotation
Custom solar plan with estimated savings, payback period, and panel placement — fully NEPRA compliant.
3. Solar Equipment Supply
We use Tier-1 solar panels, inverters (Growatt, Huawei, Inverex, etc.), mounting structures, and branded accessories.
4. Installation by Certified Technicians
Safe, clean, and professional installation completed within 1–3 days depending on system size.
5. Testing & Commissioning
We test your full system before handover to ensure performance, safety, and stability.
6. Net Metering Application (Optional)
We handle the entire net metering process — from DISCO application to meter installation.
- On-Grid (Grid-Tied) Solar System
- Off-Grid (Battery Backup) Solar System
- Hybrid Solar System (Solar + Grid + Battery)
- Customized Jugaar or Low-Cost Solutions (on demand)


How much electricity will a solar system save me monthly?
A properly sized system can reduce your electricity bill by 70–100%, depending on consumption and system type.
How long does solar installation take?
Most residential systems take 1–2 days. Larger commercial/industrial setups may take 3–7 days depending on complexity.
What’s the difference between on-grid, off-grid, and hybrid systems?
On-grid: Works with the power grid (supports net metering).
Off-grid: Works independently with batteries.
Hybrid: Combines grid + battery + solar for maximum flexibility.
Do I need approval from WAPDA or K-Electric?
For net metering, yes — and we handle the full process for you. For off-grid, no official approvals are needed.